武生特殊鋼材
画像 英語社名
English Home   About Us   Clad Metal   Metal Working  Original Blade Steel  Clad Art   Contact Us

Company Profile

Company name 

Takefu Special Steel Co.,Ltd.

Location 

21-2-1, Shiromaru-cho,Echizen City, Fukui Pref. 915-0857 Japan
TEL 0778-24-3666
FAX 0778-24-3719

Establishment

October, 1954

Capital

50,000,000 yen

C.E.O.

President  Michitsugu Kono

Numbers of employees

 45

Line of business

Clad metals(composite metals of different kinds).

Contract production and marketing of clad metals produced by rolling mills, bonding presses, solid state diffusion bonding.

Original blade steels (V-Steel series)

Monthly capacity

Hot rolling 120t
Cold rolling 100t

Site

12.862u

Land Area

Factory 4,241u
Office 541u

history

Oct. 1954 Founded with 2,000,000 yen in capital.
Oct. 1959 Concluded a contract on cross-licensing agreement on the manufacturing method of the clad metal with Yawata Iron & Steel Co., Ltd. ( present Nippon Steel Corporation).
Oct. 1964 The second plant was constructed at 63-15, Murakuni-cho, Takefu City for production increase and quality improvement.
May 1973 The head office was moved to 63-15, Murakuni-cho, Takefu City.
Dec. 1974 The Oshiho plant was constructed following the closing of the Takase plant.
May 1979 The head office was moved to 21-2-1,Shiromaru-cho, Takefu City, adjacent to the Oshiho plant.
Dec. 1979 With the expansion of the Oshiho plant and the closure of the Murakuni plant, integrated manufacture and sales system was achieved.
Oct. 1989 New head office building was constructed.
Oct. 2004 Celebrated the 50th anniversary.

Expansion of facilities

Jan. 1980 Integrated production line started on present location.
Aug.1983 Two-high cold rolling mill  installed.
Oct.1983 Four-high cold rolling mill  installed.
Oct.1986 Automatic sew cutting line  installed.
Jul. 1988 Tool-workshop constructed.
Dec.1988 Automated hot rolling line installed.
Oct.1989 No2. continuous annealing furnace  installed.
Jun.1990 Preprocessing grinding line  installed.
Mar.1992 No.1 assembling and welding robot  installed.
Jul. 1993 NC. machining center installed
Nov.1993 NC. gas cutting machine installed.
Oct.1996 NC. milling machine installed.
May 1997 No.2 and No.3 assembling and welding robots  installed.
Sep. 2005 No.2 Rotary grinding machine installed 
Jan. 2006 No.4 assembling and welding robots  installed.
Jan. 2006 Welding inspection line set up.

Copyright(C)2004 Takefu Special Steel Co.,Ltd. All Right Reserved